
Chester, VA – Drivers in Warrenton are asked to exercise caution when traveling through work zones as Columbia Gas of Virginia upgrades natural gas infrastructure in the area.
This will involve Columbia Gas replacing underground pipe in Warrenton within the right-of-way along Culpeper Street between East Shirley Avenue, also known as Route 17, and Franklin Street.
The project, which begins in early April and is estimated to wrap up in late June, will ensure the continued delivery of safe, reliable and efficient natural gas in the area for years to come.
Work will take place between the hours of 7 a.m. to 6 p.m. Weekend work is also possible, and drivers can expect potential lane and street closures with detours during working hours.
When traveling through Columbia Gas work zones, be prepared for slowed or temporarily stopped traffic. If you encounter Columbia Gas work crews, please follow these simple tips:
- Expect the unexpected – Normal speed limits may be reduced; traffic lanes may change; and people may be working on or near the road.
- Slow down – Speeding is one of the major causes of work zone crashes.
- Keep your distance – Keep a safe distance between you and the car ahead of you, and don’t tailgate.
- Pay attention to the signs – Observe the posted signs until you see the one that says you’ve left the work zone.
- Obey road crew flaggers – A flagger has the same authority as a regulatory sign, so you can be cited for disobeying his or her directions.
- Stay alert and minimize distractions – Dedicate your full attention to the roadway and avoid changing radio stations or using cell phones while driving.
Information on Columbia Gas of Virginia’s commitment to safety, including the importance of calling 811 before you dig, home and appliance safety and steps to take if you smell natural gas can be found at www.columbiagasva.com/safety/natural-gas-safety.